Technical audit of current stock
Mapping of Saras references in use: quantities, equipment, criticality, required standards. LUBESOLUT technical equivalence table verified case by case.
Verifiable technical protocol to change supplier from Saras SpA (Italia) without stopping production, with documented traceability and guaranteed reversibility.
Documented in real migrations — varies by product mix and volume
Phased migration during regular planned maintenance stops
Parallel stock + rollback protocol at any phase
Complete documentation for purchasing + maintenance audit
Verifiable protocol to migrate from Saras SpA (Italia) with traceable documentation and reversibility at any phase.
Mapping of Saras references in use: quantities, equipment, criticality, required standards. LUBESOLUT technical equivalence table verified case by case.
Controlled tests with LUBESOLUT product on non-critical equipment for 200-500 h: mechanical compatibility, anti-wear, stability, seals. Post-test analysis confirms equivalence.
Progressive equipment-by-equipment changeover during regular planned maintenance stops. No extraordinary production downtime. Parallel Saras + LUBESOLUT stock during transition for instant reversal if needed.
Sample analysis every 500-1500 h post-migration: TAN trends, viscosity, particles. Comparison against Saras historical data to detect deviations early.
Final migration report with results: actual savings achieved, equivalent compliance verified, traceable documentation for ISO 9001 and purchasing audit. Saras stock removed from catalogue (or gradual repositioning if remain ratio applies).
Technical honesty: these are the points where a migration can fail and how our protocol anticipates them.
If equipment under warranty requires Saras, wait for warranty expiry before migrating. In the meantime, plan migration for post-warranty.
Some Saras greases use thickeners incompatible with LUBESOLUT. Documented mechanical flush protocol per critical point before migration.
Gradual repositioning: use Saras stock in non-critical applications while validating LUBESOLUT in critical ones. Saras stock depletes naturally in 3-9 months.
Free audit of current stock + commercial proposal + personalized plan. No commitment.